• Font Size    
Advertising
E-mail

Close Window E-mail This Page

Red Line Repairs Now On Fast Track

Required fields are marked with an asterisk(*)



The information you provide will be used only to send the requested e-mail and will not be used to send any other e-mail communications. Read more in our Privacy Policy

Send E-mail

   Print     Share +    Comments

Red Line Repairs Now On Fast Track

BOSTON (AP) ― State transportation officials have taken steps to assure the public of the safety of the MBTA a week after a critical independent review of the agency raised several concerns.
 
The board overseeing state Department of Transportation on Monday approved a $2.5 million engineering contract designed to study a leak and corrosion problem on the Red Line subway tracks identified in the review.

The engineers will design a plan for a long-term fix estimated to cost tens of millions of dollars.

The Massachusetts Bay Transportation Authority hired another firm to perform emergency leak repair on the Red Line between Alewife and Harvard that could cause track misalignment.

State secretary of transportation Jeffrey Mullan said several other safety issues would also be addressed.

(© 2010 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.)

WBZ's Most Popular

Add Comment

here. here. Need a log in? Register here
  •  * Will not be displayed with comment
  •  * e.g. (http://www.mywebsite.com)
  •  
  • Click here to refresh with new letters

Close Window Login


Close Window Flag Comment


loading...
You need the latest Flash player to view video content.
Click here to download.

Click here to bypass this detection if you already have the latest Flash Player.